FMP Projects by School

The following list of school/administrative facility improvement projects and cost per site is extracted from the three pdf documents of the FMP. You can click on the site name to jump to the list of project for that site.

The total cost of the FMP is estimated to be $635 million, but the current bond measure will only generate $195 million pending voter approval, which will cover 30% of the total cost. There is no way of knowing where the rest of the money will come from. Since there is no itemized estimate cost for each project, there is also no way of knowing what the $195 million bond can do for each school.

Elementary

Cost (M)

MS, HS, etc

Cost (M)

Aloha Elem $15.5 Carmenita MS $22.0
Bragg Elem $15.1 Fedde MS $20.0
Burbank Elem $11.0 Haskell MS $23.4
Carver Elem $12.7 Ross MS $22.15
Cerritos Elem $16.0 Tetzlaff MS $22.1
Elliott Elem $10.6 Artesia HS $50.0
Furgeson Elem $17.0 Cerritos HS $30.0
Gonsalves Elem $15.2 Gahr HS $48.9
Hawaiian Elem $9.7 Tracy HS $20.0
Juarez Elem $12.3 Whitney HS $25.0
Kennedy Elem $14.0 Cabrillo Adult $20.0
Leal Elem $17.0 Cuesta Adult $20.0
Melbourne Elem $16.5 Central
Kitchen &
Warehouse
$2.7
Niemes Elem $16.9
Nixon Elem $15.2
Palms Elem $14.6 District Offices Unspecified
Stowers Elem $15.7 Maintenance,
Operations &
Transportation
$4.5
Willow Elem $15.8
Wittmann Elem $15.1

Grand Total

$606.65

Aloha Elementary - Estimated Project Cost: $15.5 Million
A1New Administrative Offices
A2Upgrade to 21st Century FF&E in MPR
A3Upgrade to 21st Century FF&E in 2 Kindergarten Classrooms
A4Upgrade to 21st Century FF&E in 4 Classrooms
A5Upgrade to 21st Century FF&E in 4 Classrooms
A6Upgrade to 21st Century FF&E in 4 Classrooms
A7Upgrade to 21st Century FF&E in 4 Classrooms
A18Rubber Playground Surfacing
A21All Weather Lunch Shelter
A27New Kitchen
A29New Library/Media Center
A305 New Classrooms
A31New Flexible Lab Classrooms
A32New Running Track
A33Reconfigure Parking and/or Drop-off

Bragg Elementary - Estimated Project Cost: $15.1 Million
B1Upgrade Administration Space
B2Upgrade to 21st Century FF&E in 10 standard classrooms and 2 Kindergarten Classrooms and Convert the Library/Computer Lab to a Flexible Lab Classroom
B3Upgrade to 21st Century FF&E in 12 standard classrooms, one EDC classroom, and Convert the MPR to a Library/Media Center
B14Rubber Playground Surfacing
B17All Weather Lunch Shelter
B20Relocate Daycare Portable
B22New Nutrition Services Facility
B23New MPR
B252 New Classrooms
B26Convert Computer Lab and Library to Flexible Lab Classroom
B27New Running Track
B28Reconfigure Parking and/or Drop-off

Burbank Elementary - Estimated Project Cost: $11 Million
BB1Upgrade Administration Spaces
BB2Update to 21st Century FF&E in 13 standard classrooms and 2 kindergarten classrooms
BB3Convert Library & Computer Lab to 3 standard 21st Century Classrooms
BB11Site Nutrition Services and MPR Upgrade
BB12Science Classroom
BB13Rubber Playground Surfacing
BB16All Weather Lunch Shelter
BB24New Library/Media Center
BB252 New Classrooms (1 computer lab) 2 New Kindergarten Classrooms
BB26New Flexible Lab Classroom
BB27New Running Track
BB28New Parking and Drop-off

Carver Elementary - Estimated Project Cost: $12.7 Million
C1Upgrade Administration Space and Convert Teachers¡¦ Lounge and NS to a Flexible Lab Classroom
C2Upgrade to 21st Century FF&E in 3 Kindergarten classrooms, Convert 3 Classrooms to Kindergarten Classrooms, and reconfigure north wing. Convert MPR to Library/Media Center and Teacher¡¦s Lounge
C3Upgrade to 21st Century FF&E in 10 standard classrooms
C4Upgrade to 21st Century FF&E in 8 standard Classrooms
C15Rubber Playground Surfacing
C18All Weather Lunch Shelter
C23New Nutrition Services Facility
C24New MPR
C265 New Classrooms
C28New Running Track
C29New Parking

Cerritos Elementary - Estimated Project Cost: $16 Million
CS1Upgrade Administration Spaces
CS2Upgrade 16 Classrooms to 21st Century
CS3Upgrade 3 Kindergarten Classrooms to 21st Century
CS4Convert 2 Classrooms and 1 Restroom to Library/Media Center
CS15Rubber Playground Surfacing
CS18All Weather Lunch Shelter
CS24New Nutrition Services Facility
CS25New MPR
CS266 New Classrooms
CS27New Running Track
CS28Reconfigure Parking and/or Drop-off

Elliott Elementary - Estimated Project Cost: $10.6 Million
E1Reconfigure MPR to become the new Administration Building with media center and library
E2Reconfigure Administration Office to Classroom Space
E3Convert Classroom 17/Library into standrad 21st Century Classroom
E14Rubber Playground Surfacing
E17All Weather Lunch Shelter
E23New Nutrition Services Facility
E24New MPR
E264 New Classrooms
E27New Flexible Lab Classroom
E28New Running Track
E29New Parking Lot

Furgeson Elementary - Estimated Project Cost: $17 Million
FG1Upgrade Administration Spaces
FG2Upgrade 18 Classrooms to 21st Century
FG3Upgrade 2 Kindergarten Classrooms to 21st Century
FG4Convert D Central Rooms to a Computer Lab
FG5Convert Library to 2 Classrooms
FG6Convert Nutrition Services, MPR, and 4 Classrooms to a Larger MPR
FG17Rubber Playground Surfacing
FG20All Weather Lunch Shelter
FG26Convert 2 Classrooms to Nutrition Services Facility
FG2711 New Classrooms
FG28New Library/Media Center
FG29New Flexible Lab Classroom
FG30New Running Track
FG31Reconfigured Parking and/or Drop-off

Gonsalves Elementary - Estimated Project Cost: $15.2 Million
GS1Upgrade Administration Spaces
GS2Upgrade 24 Classrooms to 21st Century
GS3Convert 1 Classroom, Library, and Computer Lab to 21st Century Library/Media Center
GS4Convert MPR to 1 Classroom and 1 Flexible Lab Classroom
GS14Rubber Playground Surfacing
GS17All Weather Lunch Shelter
GS23New Nutrition Services Facility
GS24New MPR
GS25New Band Room
GS26New Running Track
GS27Reconfigure Parking and/or Drop-off

Hawaiian Elementary - Estimated Project Cost: $9.7 Million
HI1Convert 4 Classrooms to Administrative Spaces
HI2Convert 4 Classrooms to Library/Media Center and Computer Lab
HI3Convert Library, Computer Lab, and Administrative Offices to 3 Kindergarten Classrooms
HI4Update to 21st Century FF&E in 12 standard classrooms
HI14Rubber Playground Surfacing
HI17All Weather Lunch Shelter
HI23New Nutrition Services Facility
HI24New MPR
HI2620 New Classrooms
HI27New Flexible Lab Classroom
HI28New Running Track
HI29New Parking and Drop-off Configuration

Juarez Elementary - Estimated Project Cost: $12.3 Million
J1Improve Administration Space and modernize 3 kindergarten classrooms and 1 standard classroom
J2Reconfigure Building C to provide Library/Media Center and modernize 7 standard classrooms
J3Modernize Building B MPR and 5 Classrooms
J4Reconfigure Building D library to Standard classroom and modernize 6 standard classrooms
J12Nutrition Services Upgrade - Convert 2 Classrooms to New NS Facility
J14Rubber Playground Surfacing
J17All Weather Lunch Shelter
J262 New Classrooms (1 band)
J27New Flexible Lab Classroom
J28New Running Track
J29New Drop-off

Kennedy Elementary - Estimated Project Cost: $14 Million
K1Improve Administrtion Space and Reconfigure MPR to new Library/Media Room
K2Modernize 18 standards classroms
K3Modernize 2 Kindergarten Classrooms
K14Rubber PLaygroung Surfacing
K17All Weather Lunch Shelter
K23New Nutrition Services Facility
K24New MPR
K266 New Classrooms
K27New Flexible Lab Classroom
K28New Running Track
K29New Parking

Leal Elementary - Estimated Project Cost: $17 Million
LL1Improve Administration Space and 2 standard Classrooms in Building A
LL2Modernize 5 standard classrooms Building B and Reconfigure Computor Lab/Library to Flex Lab
LL3Modernize 6 Standard Classrooms in Building C and Convert the Center Space to one additional Classroom
LL4Modernize 4 Standard Classromms in Building D and Convert Center Space to one additional Classroom and Convert the MPR to 2 standard classrooms
LL5Modernize 3 Standard Classrooms, 2 Kindergarten Classrooms in Building E and Convert the Center Space to one additional Classroom
LL14Rubber Playground Surfacing
LL17All Weather Lunch Shelter
LL23New Nutrition Services Facility
LL24New MPR
LL25New Library/Media Center
LL266 New Classrooms (1 band)
LL28New Running Track
LL29New Drop-off Configuration

Melbourne Elementary - Estimated Project Cost: $16.5 Million
MB1Improve Administration Space and add on 1500 Square feet of new building
MB2Modernize 4 Kindergarten Classrooms
MB3Modernize 24 Standard Classrooms
MB4Convert Library to Flex Library
MB5Convert MPR to Library/Media Center and 2 standard classrooms
MB16Rubber Playground Surfacing
MB19All Weather Lunch Shelter
MB25New Nutrition Services Facility
MB30New Running Track
MB31New Parking and Drop-off

Niemes Elementary - Estimated Project Cost: $16.9 Million
NM1Improve Administration Space and Reconfigure MPR to Library /Media Center and Meeting Space - Building A
NM2Modernize 2 Kindergaten Classrooms - Building B
NM3Modernize 8 standard Classrooms - Building C
NM4Modernize 6 standard Classrooms and Convert 2 Classrooms to a Flexible Lab CR - Building D
NM5Modernize 4 standard Classrooms - Building E
NM16Rubber Plaground Surfacing
NM19All Weather Lunch Shelter
NM25New Nutrition Services Facility
NM26New MPR
NM2811 New Classrooms (1 band)
NM30New Running Track
NM31Reconfigure Parking and/or Drop-off

Nixon Elementary - Estimated Project Cost: $15.2 Million
N1Update Administration Space
N2Upgrade to 21st Century FF&E in 2 kindergarten classrooms, 23 standard classrooms, 1 computer laboritories, and convert Multi-Purpose Room to Library/Media Space
N13Rubber Playground Surfacing
N16All Weather Lunch Shelter
N21New Nutrition Services Facility
N22New MPR
N248 New Classrooms (1 band)
N26New Running Track
N27New Parking and Drop-off

Palms Elementary - Estimated Project Cost: $14.6 Million
PM1Improve Administration Space
PM2Reconfigure Building L to Create a New Library/Media/Computer Center and Flexible Lab CR
PM3Modernize 20 Standard Classrooms
PM4Modernize 2 Kindergarten Classrooms
PM16Rubber Playground Surfacing
PM19All Weather Lunch Shelter
PM25Nutrition Services Facility Addition and Modernization
PM289 New Classrooms
PM30Reconfigure Parking and/or Drop-off

Stowers Elementary - Estimated Project Cost: $15.7 Million
ST1Upgrade Administration Spaces and 3 Kindergarten Classrooms
ST2Upgrade 12 Classrooms in 200 Building and Reconfigure the Central MPR into a Library/Media Room
ST3Upgrade 12 Classrooms in 300 Building and Reconfigure the Central MPR into a ComputerLab
ST4Convert Existing Library Rooms to a FlexibleLab Classroom
ST14Rubber Playground Surfacing
ST17All Weather Lunch Shelter
ST23New Nutrition Services Facility
ST24New MPR
ST25New Running Track
ST26Recofigured Parking and/or Drop-off

Willow Elementary - Estimated Project Cost: $15.8 Million
WL1Reconfigure Administration Building to Library/Media Center
WL2Reconfigure MPR to Administration Offices and Computer Lab
WL3Modernize 18 Standard Classrooms
WL4Modernize 5 Kindergarten Classrooms
WL16Rubber Playground Surfacing
WL19All Weather Lunch Shelter
WL25New Nutrition Services Facility
WL26New MPR
WL288 New Classrooms
WL29New Flexible Lab Classroom
WL30New Running Track
WL31Reconfigure Parking and/or Drop-off

Wittmann Elementary - Estimated Project Cost: $15.1 Million
W1Improve Administration Space and Reconfigure Library/Computor Lab to additional Administration Space
W2Modernize 21 standard classrooms
W3Modernize 2 Kindergarten Classrooms
W14Rubber Playground Surfacing
W17All Weather Lunch Shelter
W23New Nutrition Services Facility
W24New MPR
W25New Library/Media Center
W262 New Classrooms (band and computer lab)
W28New Running Track
W29Reconfigure Parking and/or Drop-off

Carmenita Middle School - Estimated Project Cost: $22 Million
CM1Upgrade Administration Spaces
CM2Upgrade 25 Standard Classrooms to 21st Century
CM3Upgrade 2 Science Classrooms to 21st Century
CM4Upgrade 1 Art Classroom to 21st Century
CM5Upgrade Library to 21st Century
CM6Upgrade MPR to 21st Century
CM7Convert 200 Building Support Spaces to Library Expansion
CM8Convert 1 Classroom to STEM Lab
CM21All Weather Lunch Shelter
CM27New Nutrition Services Facility
CM28New Gymnasium with Locker Facilities
CM29New Running Track
CM30Reconfigured Parking and/or Drop-off

Fedde Middle School - Estimated Project Cost: $20 Million
FM1Upgrade Administration Spaces
FM2Upgrade 22 Classrooms to 21st Century
FM3Upgrade 2 Science Classrooms to 21st Century
FM4Convert Office Space to 1 Classroom
FM5Upgrade Library to 21st Century
FM6Upgrade MPR to 21st Century and Convert Broadcasting Classroom and TL Wing to MPR Expansion
FM7Upgrade Locker Buildings to 21st Century
FM20All Weather Lunch Shelter
FM26New Nutrition Services Facility
FM275 New Classrooms
FM281 New STEM Lab
FM29New Gymnasium
FM30New Administration Addition
FM31Reconfigure Parking and/or Drop-off

Haskell Middle School - Estimated Project Cost: $23.4 Million
H1Upgrade Administration Space and incorporate existing Library room
H3-10Upgrade Classrooms to 21st Century, Convert 705 to additional STEM Lab (possibly supporting Broadcast)
H11Upgrade MPR and Band Room to 21st Century
H12Upgrade 2 Science Classrooms to 21st Century
H13Upgrade 1 Science Classroom to 21st Century
H21Nutrition Services Upgrade
H26All Weather Lunch Shelter
H32Expand Nutrition Services
H34New Library/Media Center
H37New Running Track
H38New Secure Staff Parking
H39New Gymnasium

Ross Middle School - Estimated Project Cost: $22.15 Million
RM1Upgrade Administration Spaces
RM2Upgrade 19 Classrooms to 21st Century
RM3Upgrade 4 Science Classrooms to 21st Century
RM4Upgrade 1 Art Classroom to 21st Century
RM5Upgrade 1 Band Classroom
RM6Upgrade Locker Building to 21st Century
RM7Convert Library to STEM Lab
RM8Convert MPR to Theater
RM9Convert Teachers¡¦ Lounge to 1 Classroom
RM23All Weather Lunch Shelter
RM29New Nutrition Services Facility
RM30New MPR
RM31New Library/Media Center and Computer Lab/Broadcast Building
RM32New Gymnasium
RM33New Running Track
RM34Reconfigure of Parking and/or Drop-off

Tetzlaff Middle School - Estimated Project Cost: $22.1 Million
T1Upgrade Administration Spaces and Expand
T2Upgrade 7 Classrooms to 21st Century and Convert Auditorium to 1 STEM Lab
T3Upgrade 4 Classrooms to 21st Century and Convert the Cafeteria, NS Facility, and 2 Classrooms to a Library/Media Center
T4Upgrade 4 Standard Classrooms and 2 Science Classrooms to 21st Century and Convert D Center to an additional Classroom
T5Upgrade 4 Standard Classrooms, 1 Wood Shop, 1 Science Lab, and ELD Room to 21st CenturyClassrooms
T6Upgrade 6 Classrooms to 21st Century and Convert Library to additional Classroom
T19All Weather Lunch Shelter
T25New Nutrition Services Facility
T26New MPR
T30New Running Track
T31Reconfigured Parking and/or Drop-off
T32New Gymnasium

Artesia High School - Estimated Project Cost: $50 Million
AH1Upgrade Administration Spaces
AH2Upgrade 57 Classrooms to 21st Century
AH3Upgrade 7 Science Classrooms to 21st Century
AH4Upgrade 1 Art Classroom to 21st Century
AH5Upgrade Library to 21st Century
AH22(EIP1) All Weather Lunch Shelter
AH28New Nutrition Services Facility
AH29New Fine Arts Center
AH308 New Classrooms
AH31New Gymnasium
AH32New Aquatics Facility
AH33New Locker Buildings
AH34New Student Union
AH35(EIP2) 2 New Portable Buildings
AH36New Tennis Courts
AH37Reconfigure Parking and/or Drop-off
AH38Additional Entrance to Campus

Cerritos High School - Estimated Project Cost: $30 Million
CH1Upgrade Administration Spaces
CH2Upgrade 55 Classrooms to 21st Century
CH3Upgrade 13 Science Classrooms to 21st Century
CH4Upgrade 2 Art Classrooms to 21st Century
CH5Upgrade Locker Buildings to 21st Century
CH6Upgrade Gym to 21st Century
CH7Upgrade Little Theater Room to 21st Century
CH8Convert Administration Offices to Library/MediaCenter
CH29New Nutrition Services Facility
CH3010 New Classrooms and Study Hall
CH31New Aquatics Facility
CH32New Student Union
CH33Expand Administrative Offices
CH34Reconfigure Parking and/or Drop-off

Gahr High School - Estimated Project Cost: $48.9 Million
GH1Upgrade Administrative Spaces
GH2Convert Library into central Student Center
GH3Upgrade 52 Classrooms to 21st Century
GH4Upgrade 7 Science Classrooms to 21st Century
GH5Upgrade 3 Engineering Labs to 21st Century
GH6Upgrade 1 Graphic Arts Classroom and 2 Computer Labs to 21st Century
GH7Upgrade 2 Art Classrooms to 21st Century
GH8Upgrade 1 Journalism Classroom to 21st Century
GH9Upgrade 3 Classrooms in 700 wing to 21st Century
GH17Upgrade Nutrition Services Facility
GH22All Weather Lunch Shelter
GH28Expand Nutrition Services Facility
GH29Expand MPR
GH30New Library/Media Center
GH33New Tennis Courts
GH34New Gymnasium
GH35New Aquatics Facility
GH36New Performing Arts Building
GH37Reconfigure Parking and/or Drop-off

Tracy High School - Estimated Project Cost: $20 Million
TH1Upgrade Administration Spaces
TH2Upgrade 12 Classrooms to 21st Century
TH3Upgrade 1 Science Classroom to 21st Century
TH4Upgrade 1 Art Classroom to 21st Century
TH5(IC1) Upgrade Infant Center to 21st Century
TH6Convert Graphics Department to 3 Classrooms
TH20(IC2) All Weather Lunch Shelter
TH268 New Classrooms
TH27New Play Field
TH28Reconfigure Parking and Drop-off

Whitney High School - Estimated Project Cost: $25 Million
WT1Upgrade Administration Spaces
WT2Upgrade 35 Classrooms to 21st Century
WT3Upgrade 2 Science Classrooms to 21st Century
WT4Upgrade 1 Art Classroom to 21st Century
WT5Upgrade MPR to 21st Century
WT6Upgrade Gym to 21st Century
WT27New Nutrition Services Facility
WT28New Libary/Media Center
WT29New Computer Lab Classroom
WT30New Student Center
WT31New Teachers¡¦ Lounge
WT32New Band Building
WT33Reconfigure Parking and/or Drop-off

Cabrillo Adult School - Estimated Project Cost: $20 Million
CA1Upgrade Administration Spaces
CA2Upgrade 23 Classrooms to 21st Century
CA3Upgrade MPR to 21st Century
CA9Upgrade Site Lighting
CA17All Weather Lunch Shelter
CA247 New Classrooms
CA25Reconfigured Parking and/or Drop-off

Cuesta Adult School - Estimated Project Cost: $20 Million
CU1Upgrade Administration Spaces
CU2Upgrade 10 Classrooms and Upholstery Center to 21st Century
CU16All Weather Lunch Shelter
CU22New Student Center
CU2319 New Classrooms
CU24New Fitness Center
CU25New Assessment Center
CU26Reconfigure Parking and Drop-off

District Offices - Estimated Project Cost: Unspecified
SF1Reconfigure 52000 sf District Office (SF = Staff Facilities)

Maintenance, Operations & Transportation - Estimated Project Cost: $4.5 Million
SF2Renovation of M.O.T. (SF = Staff Facilities)

Central Kitchen & Warehouse - Estimated Project Cost: $2.7 Million
SF3Renovation of District Warehouse (SF = Staff Facilities)



 